Concrete contractor in Milton, VT - driveways, patios and slabs built in the right order
South Burlington Concrete is a concrete contractor based in South Burlington, VT, and we pour driveways, patios, steps, garage floors and foundations in Milton, with the base, the drainage and the cure planned before the truck comes.

Why Milton homeowners redo their concrete
Most calls start with something you can see, like a driveway cracked across, a patio sunk at one corner or water pooling by the steps after rain. Under most of those sits the same cause. The ground under the slab, what we call the subgrade, was raked level instead of dug out and packed, so it settled and took the concrete with it.
That's why I put the base ahead of the finish. Nobody sees it after the first day, so it's tempting to cut, but it decides whether the slab stays flat. Where a yard slopes, we can talk about concrete retaining walls to hold the ground before we pour.
Concrete work we do in Milton
- Concrete driveway building
- Concrete patio construction
- Stamped concrete services
- Concrete sidewalk building
- Garage floor concrete
- Decorative concrete
- Concrete retaining walls
- Concrete floor installation
- Concrete pool decks
- Concrete steps construction
- Slab foundation building
- Foundation installation
- Concrete parking lot building
- Concrete footings
- Foundation raising
- Concrete cutting
How a Milton concrete job runs
Call or send the form
Call (802) 307-1329 or use the form and tell us what you have in mind, and we'll answer by phone or email, whichever way you reached us.
I walk the site with you
I come out myself, walk the job with you, take measurements and answer your questions, then send a written estimate that lists the work and materials.
Permit, then a pour date
We help you file what Milton's zoning office needs. It has up to 30 days on a complete application, so we plan the pour date around that and the weather.
What we check before pouring in Milton
On a Milton job, I look past the slab itself. We ask Milton's Planning & Zoning department whether your lot falls in the flood hazard overlay district, and because digging out for a base disturbs soil, we plan for the erosion control and stormwater rules that apply to that work.
The price moves with the size of the slab, how much digging and base it needs, how thick it has to be for cars or foot traffic, the finish you pick and how easy the site is to reach. The schedule turns on any permit, the weather and curing, the wait while concrete gains strength before it takes weight. Your written estimate spells out each piece.
We do the same work in Colchester and Shelburne, and if your city isn't listed, please ask. When you're ready, call (802) 307-1329 or send the form and ask for an estimate.
Tell us about your Milton project
Send what you'd like poured and roughly how big. We reply within one business day, and I come out for a free estimate with no pressure to book.

What Milton homeowners ask us to pour
- New driveways built on a dug-out, packed base
- Patios sloped to drain away from the house
- Front steps and walks replaced
- Garage floors poured over solid ground
- Footings and slab foundations for additions
- Control joints, cut lines where cracks are meant to go
Why choose South Burlington Concrete in Milton
I come out to every job myself and write the estimate, so the person you talk to first is the one planning your pour. Our crew lead runs the work on site, I check in along the way, and you shouldn't have to chase us for an answer.
We do things in order because most concrete trouble starts with a rushed or skipped step. If the forecast turns, I'd rather move your pour than place concrete in poor conditions. We're licensed and insured, satisfaction guaranteed, and you can reach me at (802) 307-1329 when you're ready.
Milton concrete questions
Do I need a zoning permit for a concrete patio in Milton, VT?
Often, yes. Milton's zoning office reviews permits for patios in many cases, as well as for most swimming pools. A driveway or front walk isn't on its list, which doesn't mean it's exempt, so we ask the office about your exact project before anything is scheduled.
When can concrete work start after a Milton zoning permit is approved?
Work can start once the 15-day appeal period is over. The Town of Milton's zoning permit application says no work begins until every permit and approval is in, and that after approval you post notice on the property for those 15 days. It's an older form, so we confirm current steps with the zoning office.
How long does a zoning permit last in Milton, VT?
Milton's zoning guidance says a permit expires two years from its approval date. You can renew it for one more year for an added fee if you ask the zoning office before it runs out. When the work is done, a Certificate of Compliance is required, and the Zoning Administrator inspects the work against the permit.
Does Vermont's energy code apply to a slab for a home addition?
It can, if the addition will be heated or cooled. Vermont law says residential construction, additions included, has to meet the state's Residential Building Energy Standards, but an addition that's neither heated nor cooled is exempt, and adding on doesn't bring the whole house under them. Tell me how you'll use the space when I come out.
Will my new concrete driveway crack like the old one did?
It can still crack, but good prep keeps cracks small and in planned places. We dig out and pack the base, slope the slab away from the house, avoid pouring in midday heat and cut control joints, grooves that give a crack a place to go, before the slab can crack on its own.